MHCA acknowledges it is located on Treaty One land and the homeland of the Metis Nation

Province seeks comments, input from industry on North Perimeter

Manitoba Infrastructure has announced it is beginning the planning for improvements to the North Perimeter, which will focus on closing all non-signalled median openings and stop sign-controlled access points.

The plan will limit access to the North Perimeter via intersections that are signalled appropriately or have interchanges.

The department specifically requested members of the heavy construction industry add their comments, which can be done through the Engage Manitoba website https://engagemb.ca/north-perimeter-safety-review.

This is the second phase of the province’s Perimeter improvement plan. The first phase laid out changes coming to the South Perimeter, also intended to improve safety and efficiency through closing 26 median cuts and the uncontrolled access to the highway.

Both projects will take multiple years to complete.

Chair’s Gala

November 18, 2022
RBC Convention Centre

Close to 650pp attended from both industry, government and stakeholder partners.  It was the closing of Nicole Chabot’s two year term as Chair.  Dennis Cruise of Bituminex Paving was welcomed as the new Chair.

Press [Esc] to close

2022 Heavy Santa

December 16, 2022
David Livingstone School

This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.

104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School. 

Press [Esc] to close

Awards Breakfast & Annual General Meeting

November 18, 2022
RBC Convention Centre

Manitoba Transportation & Infrastructure (MTI) Award Winner

  • Grading – Strilkiwski Contracting Ltd.: PTH 6 Grahamdale
  • Paving – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PTH 83
  • Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
  • Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
  • Major Structures – D. Steele Construction: Bridge Replacement over the Red River Floodway on PTH 59N
  • Minor Structures – Moncrief Construction Ltd.: Reinforced concrete box culvert on PTH 5
  • Water Management – Brunet Ltd.: Flood response, Morris ring dike closure

200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.

31 companies were recognized for their milestone membership commitments.

Matthew Neziol, of Bayview Construction, received the Safety Leader Award.

Press [Esc] to close