MHCA acknowledges it is located on Treaty One land and the homeland of the Red River Metis

Join the MHCA!

Our ~400 members include contractors engaged in roadbuilding, sewer and water, excavation, bridge building, as well as sub-trades and suppliers of aggregates, petroleum, engineering, heavy equipment, financial and bonding services.

Want to join our association?

Please fill out the online form below or download the 2025 membership form.

E-mail your completed form to MHCA Operations Manager Christine Miller at christine@mhca.mb.ca or fax it to 204-943-2279. If you have questions, please don’t hesitate to contact Christine.

Apply & pay for your membership online
with a credit card. 

To pay via cheque download the above membership form. Please note that membership will only be processed once payment is received.

Need Help?

If you have questions, please don’t hesitate to call or e-mail Christine Miller, MHCA Operations Manager, at (204) 594-9053 or christine@mhca.mb.ca.

Fee Schedule

CONTRACTOR
Those persons, firms, partnerships or corporations engaged in road, street, highway, sewer and water construction, crushing and other related heavy construction activities.

Annual VolumeAnnual Fee
under $500,000$790
$500,000 to $1,500,000$1,430
$1,500,000 to $2,500,000$2,265
$2,500,000 to $5,000,000$2,975
$5,000,000 to $10,000,000$4,775
$10,000,000 and over$5,795

CONTRACTOR AFFILIATE
Is available for those contractor companies whose parent company has accounted for the affiliate company in compiling total annual volume when calculating membership dues.

Annual fee: $1,070

SUPPLIER
Those individuals, firms or corporations who supply goods, materials, and services to the heavy construction industry

Annual VolumeAnnual Fee
Under $5,000,000$1,220
$5,000,000 to $20,000,000$2,070
Over $20,000,000$2,860

SUPPLIER AFFILIATE
Available to supplier company affiliate at an additional flat fee per afflliate provided that the largest volume member in the company cluster pays its membership at the appropriate supplier rate.

Annual fee: $1,100

UTILITY CORPORATION
Those corporations engaged in the primary supply of utility services, including but not limited to telephone, natural gas and electrical supply.

Annual VolumeAnnual Fee
Under $5,000,000$2,205
$5,000,000 to $10,000,000$2,760
Over $10,000,000$4,965

FINANCIAL INSTITUTION
Those involved in providing financial services to the industry including Chartered Banks, Credit Unions, Trust Companies, and other such similar institutions.

Annual fee: $1,600

CONSULTANT/PROFESSIONAL
Those individuals, firms or corporations who provide professional services to the heavy construction industry. These include legal, accounting, consulting and engineering services.

Annual fee: $985

Rates effective November 1, 2024 – October 31, 2025

Chair’s Gala

November 18, 2022
RBC Convention Centre

Close to 650pp attended from both industry, government and stakeholder partners.  It was the closing of Nicole Chabot’s two year term as Chair.  Dennis Cruise of Bituminex Paving was welcomed as the new Chair.

Press [Esc] to close

2022 Heavy Santa

December 16, 2022
David Livingstone School

This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.

104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School. 

Press [Esc] to close

Awards Breakfast & Annual General Meeting

November 18, 2022
RBC Convention Centre

Manitoba Transportation & Infrastructure (MTI) Award Winner

  • Grading – Strilkiwski Contracting Ltd.: PTH 6 Grahamdale
  • Paving – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PTH 83
  • Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
  • Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
  • Major Structures – D. Steele Construction: Bridge Replacement over the Red River Floodway on PTH 59N
  • Minor Structures – Moncrief Construction Ltd.: Reinforced concrete box culvert on PTH 5
  • Water Management – Brunet Ltd.: Flood response, Morris ring dike closure

200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.

31 companies were recognized for their milestone membership commitments.

Matthew Neziol, of Bayview Construction, received the Safety Leader Award.

Press [Esc] to close