MHCA acknowledges it is located on Treaty One land and the homeland of the Red River Metis

CCDC 14 – 2013

$12.00$83.00

Design-Build Stipulated Price Contract

SKU: CCDC142013 Category:

CCDC 14 is a standard prime contract between the Owner and the Design-Builder where the Design-Builder provides the Design Services and performs the Work under one agreement, for a single, pre-determined stipulated or fixed price.

In addition to the common contract terms and conditions for construction projects, CCDC 14 clearly defines the roles and responsibilities of the contracting parties:

Owner

  • Provides project information;
  • Makes decisions;
  • Interprets the Owner’s Statement of Requirements;
  • Reviews and approves Construction Documents;
  • Requires inspection or testing of the Work.

Design-Builder

  • Controls the Design Services and the Work;
  • Reviews Owner’s Statement of Requirements or other project information;
  • Develops Construction Documents;
  • Engages Consultants, Other Consultants and Subcontractors.

CCDC 14 also identifies and describes the roles of other parties such as the Consultant and Payment Certifier as well as Owner’s Advisor, if any.

Reg # / Seal

Registration # (Electronic), Seals

Chair’s Gala

November 18, 2022
RBC Convention Centre

Close to 650pp attended from both industry, government and stakeholder partners.  It was the closing of Nicole Chabot’s two year term as Chair.  Dennis Cruise of Bituminex Paving was welcomed as the new Chair.

Press [Esc] to close

2022 Heavy Santa

December 16, 2022
David Livingstone School

This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.

104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School. 

Press [Esc] to close

Awards Breakfast & Annual General Meeting

November 18, 2022
RBC Convention Centre

Manitoba Transportation & Infrastructure (MTI) Award Winner

  • Grading – Strilkiwski Contracting Ltd.: PTH 6 Grahamdale
  • Paving – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PTH 83
  • Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
  • Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
  • Major Structures – D. Steele Construction: Bridge Replacement over the Red River Floodway on PTH 59N
  • Minor Structures – Moncrief Construction Ltd.: Reinforced concrete box culvert on PTH 5
  • Water Management – Brunet Ltd.: Flood response, Morris ring dike closure

200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.

31 companies were recognized for their milestone membership commitments.

Matthew Neziol, of Bayview Construction, received the Safety Leader Award.

Press [Esc] to close