MHCA acknowledges it is located on Treaty One land and the homeland of the Red River Metis

CCDC 2MA – 2016

$12.00$83.00

Master Agreement between Owner and Contractor

SKU: CCDC2MA2016 Category:

CCDC 2MA – 2016 Master Agreement is developed to meet the needs of Owners with an on-going construction or maintenance program: to enter into specific work arrangements quickly and easily, without having to review and re-negotiate general terms and conditions for each work order.

The Master Agreement is a contract form between Owner and Contractor that is applicable for a defined period of time and is intended to establish contractual terms and conditions (excluding scope, time and cost) for multiple projects during that time period.  Each project will be ordered by means of Work Authorizations, that define the project specific requirements like scope, price, time.

Reg # / Seal

Registration # (Electronic), Seals

Chair’s Gala

November 18, 2022
RBC Convention Centre

Close to 650pp attended from both industry, government and stakeholder partners.  It was the closing of Nicole Chabot’s two year term as Chair.  Dennis Cruise of Bituminex Paving was welcomed as the new Chair.

Press [Esc] to close

2022 Heavy Santa

December 16, 2022
David Livingstone School

This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.

104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School. 

Press [Esc] to close

Awards Breakfast & Annual General Meeting

November 18, 2022
RBC Convention Centre

Manitoba Transportation & Infrastructure (MTI) Award Winner

  • Grading – Strilkiwski Contracting Ltd.: PTH 6 Grahamdale
  • Paving – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PTH 83
  • Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
  • Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
  • Major Structures – D. Steele Construction: Bridge Replacement over the Red River Floodway on PTH 59N
  • Minor Structures – Moncrief Construction Ltd.: Reinforced concrete box culvert on PTH 5
  • Water Management – Brunet Ltd.: Flood response, Morris ring dike closure

200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.

31 companies were recognized for their milestone membership commitments.

Matthew Neziol, of Bayview Construction, received the Safety Leader Award.

Press [Esc] to close