CCDC 3 – 2016 is a standard prime contract between Owner and prime Contractor to perform the required work on an actual-cost basis, plus a percentage or fixed fee which is applied to actual costs.
Close to 650pp attended from both industry, government and stakeholder partners. It was the closing of Nicole Chabot’s two year term as Chair. Dennis Cruise of Bituminex Paving was welcomed as the new Chair.
Press [Esc] to close
2022 Heavy Santa
December 16, 2022 David Livingstone School
This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.
104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School.
Press [Esc] to close
Awards Breakfast & Annual General Meeting
November 18, 2022 RBC Convention Centre
Manitoba Transportation & Infrastructure (MTI) Award Winner
Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
Major Structures – D. Steele Construction:Bridge Replacement over the Red River Floodway on PTH 59N
Minor Structures – Moncrief Construction Ltd.:Reinforced concrete box culvert on PTH 5
Water Management – Brunet Ltd.:Flood response, Morris ring dike closure
200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.
31 companies were recognized for their milestone membership commitments.
Matthew Neziol, of Bayview Construction, received the Safety Leader Award.