MHCA acknowledges it is located on Treaty One land and the homeland of the Red River Metis

CCDC 40 – 2018

$23.00

Rules for Mediation and Arbitration of Construction Disputes

SKU: CCDC402018 Category:

CCDC 40 – Rules for Mediation and Arbitration of Construction Disputes sets out specific methods for settling disputes incorporating the concepts of negotiation, mediation and arbitration to encourage speedy, inexpensive and voluntary resolutions of construction disputes.

CCDC 40 has been incorporated by reference in CCDC contract forms, including CCDC 2. It is also a standalone document and can be used with other construction contract forms.

Some of the features included in CCDC 40:

  1. Graphic sequence of the process delineated in PART 8 – DISPUTE RESOLUTION of CCDC 2 – 2005, including timeframes for expeditious resolution of construction disputes;
  2. Model mediator and arbitrator agreements;
  3. To the extent legally permissible, CCDC 40 will override mediation and arbitration rules in provincial/territorial legislation; and
  4. The joinder of additional parties with an interest in a dispute to be resolved by arbitration will be permissible only if all parties consent and the proposed additional party consents.
Document type

Electronic, Hardcopy

Chair’s Gala

November 18, 2022
RBC Convention Centre

Close to 650pp attended from both industry, government and stakeholder partners.  It was the closing of Nicole Chabot’s two year term as Chair.  Dennis Cruise of Bituminex Paving was welcomed as the new Chair.

Press [Esc] to close

2022 Heavy Santa

December 16, 2022
David Livingstone School

This event was made possible through fundraising at the MHCA Chair’s Gala and Spring Mixer.

104 goodie bags and presents were prepared for the grades 1-4 students at David Livingstone School. 

Press [Esc] to close

Awards Breakfast & Annual General Meeting

November 18, 2022
RBC Convention Centre

Manitoba Transportation & Infrastructure (MTI) Award Winner

  • Grading – Strilkiwski Contracting Ltd.: PTH 6 Grahamdale
  • Paving – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PTH 83
  • Urban Works – Coco Paving o/a Russell Redi-Mix: Bituminous Reconstruction PA 634 and Bituminous Pavement PTH 5
  • Special Projects – Mekhana Development Corp/Arnason Industries Ltd: Theresa Point Airport
  • Major Structures – D. Steele Construction: Bridge Replacement over the Red River Floodway on PTH 59N
  • Minor Structures – Moncrief Construction Ltd.: Reinforced concrete box culvert on PTH 5
  • Water Management – Brunet Ltd.: Flood response, Morris ring dike closure

200 members and guests gathered to hear greetings from Premier Heather Stefanson and the newly elected Mayor of Winnipeg, Scott Gillingham. Hon. Doyle Piwniuk, Minister, Manitoba Infrastructure, handed out the MTI Awards.

31 companies were recognized for their milestone membership commitments.

Matthew Neziol, of Bayview Construction, received the Safety Leader Award.

Press [Esc] to close